COMMERCIAL PROJECTS

City Hall, Nevada City, California

COMMERCIAL & CIVIC

Tilden Park Maintenance Facility, Tilden Park, Berkeley, California. 2012

A new 5,500 square foot equipment and vehicle maintenance shop for East Bay Regional Park District. Set in Tilden Park, the shop will serve the District's large truck and tractor fleet. Energy efficient and fire resistant CMU construction.

Railroad Avenue Pacific Pride Cardlock, Grass Valley, California. 2011

Site Planning, Architectural design and project coordination for a new bulk fuel plant, gas station, and 5,000SF warehouse for Hunt & Sons, Inc. This project includes an extension of the Wolf Creek Trail and state of the art environmental  controls for a new fueling center for the region.

Gillespie Group Camp, Tilden Park, Berkeley, California. 2011

One of the few ADA accessible overnight camps for kids in the Park District.  The camp is arranged around an ADA accessible winding ramp/walkway with restrooms and cooking facilities

P1000814


100 Union Street, The Griggs Building. 2008.

A project to transform one of the last developable lots in downtown Nevada City. This award winning 16,000 SF  brick building includes retail, office and apartments. The project included the restoration of a neglected park into a vibrant urban plaza. 

227 Broad Street and 119 South Pine. 2008 - 2009

Restoration projects in downtown Nevada City that reconnect and restore two buildings into a new retail complex. 9,000 total square feet.

Tilden Park Merry Go Round, 1998 to 2008

The complete restoration and enclosure of a landmark merry go round in  the East Bay Regional Park District’s flagship park.

Del Oro Theater, Grass Valley CA, 2006

An interior and exterior restoration of an iconic Art Deco 1936 movie house that anchors downtown Grass Valley. 7,800 SF.

P1010007beige3B

                                   Exterior Design Study, Del Oro Theater


109 North Pine Building, 2003.

A replacement building in the heart of Nevada City for a previous conglomeration of historic brick buildings. 109 North Pine building is a 24,600 square foot, steel framed, brick sheathed, three stories, historically appropriate retail and commercial structure.

Nevada County Narrow Gauge Railroad Museum, 2001

A recreation of the original Nevada City railroad station for use as a working museum to house, restore, and display historic artifacts from the Nevada County Narrow Gauge Railroad. 6800 SF

City Hall for the City of Nevada City, 2000

A restoration and addition to the historic 1936, ‘Art Moderne’, WPA project, Nevada City Hall. 14,000 SF.

Medical Office for Robert Lowe, MD, 2000

Interior remodeling of existing medical office. 2500 SF.

Fire Station #3, 13500 Tyler Foote Road, 1998

A 4,000 SF primary fire station and main District office. North San Juan California, CA

East Bay Regional Park District Projects, 1997 though 2012:

    Tilden Park Merry Go Round Renovation, 2008 . 6,500 SF

    Gillespie Group Camp

    Headquarters Board Room

    Lake Chabot Maintenance Facility

    Tilden Corporation Yard Master Planning

    Ardenwood Farm Walnut Huller Shed and Snackbar 

 © Bruce E. Boyd, Architecture & Planning 2012